Guandong Kexin United Power Co., Ltd.

 

Lithium Battery Industrial Park


 

The industrial park is located in Huiyang District, Huizhou City. The total planned area of ​​the park is 200,000 square meters. The total investment of the first phase is 1 billion yuan. The construction of 70,000 square meters has begun. The construction area is 181,457.08 square meters.

 

pic

 

 

 

Cell production line


 

The annual production capacity of the first phase is 1GWh, and the world-class fully automated equipment is adopted to minimize the errors caused by manual operation. The purification level of the large environment is 100,000, and the small environment can reach 10,000. The MES system is introduced into the whole line, so that the whole life cycle of the product can be traced, and the maximum guarantee for customers to use the battery safely and safely.

 

园区概览